Skip to content

You are here: Home / Contracts / Medium and long-term production planning tool

Medium and long-term production planning tool

 

 

 

Funding entity: 
INDUSTRIAS QUÍMICAS DEL OXIDO DE ET.

Start date: 01/10/2018
End date: 31/12/2018

 

logo_ioc.png


Team

 

García-Villoria, Alberto

Scientific coordinator and contact

 

 

 

 

 

 

 

Pastor, Rafael

Senior professor

 

 

Contract description

The project tries to develop, program, test and validate a computer system that provides, automatically and efficiently, through the resolution of a mathematical model, a production and sales planning in a single period of time, located in the middle-long term. The objective is to obtain an optimal solution in relation to the beneficiaries and, in addition, try to achieve both minimum stocks and a minimization of the total number of units that cannot be served to customers in relation to their minimum demand. This last objective, the existence of units not served, indicates a lack of capacity of the productive system with respect to the minimum demands of the clients that have been provided as data.

 

Amount: 8.000,00 €

 

Main collaboration: